Other language: Vietnamese

The Path of Survival.

Chapter 224: Continuous Testing. [224]



Summary

The construction of an automated irrigation system involved aligning vertical and horizontal bamboo tubes, requiring adjustments for water flow. After setting up supports and installing the tubes, testing revealed issues with water splashing and uneven distribution. Adjustments were made, including raising tube positions and blocking front openings to ensure even flow. Despite challenges, the system was nearly complete, with only minor tweaks needed to optimize water distribution across all openings. The team focused on enhancing flow rates and addressing uneven irrigation to ensure successful operation.

Full content

Loading...